Minnesota Department of Commerce – Battery Energy Storage Incentives

Sep 20
2 min read
Minnesota Department of Commerce – Battery Energy Storage Incentives
Minnesota Department of Commerce – Battery Energy Storage Incentives

Minnesota Tribal Entities are Eligible to Apply for up to $7,000


DEADLINE

Rolling until funds are fully distributed or June 30, 2027


EXPECTED PROJECT START DATE OR AWARD NOTIFICATIONS EXPECTED

Rolling / first-come, first-served; no fixed award notification date.


TYPE OF PROGRAM

State of Minnesota offers incentives for new on-site battery energy storage systems up to 50 kWh that are paired with solar. Projects outside Xcel Energy territory are administered by the Minnesota Department of Commerce, while projects within Xcel territory are administered by Xcel Energy. Funding is limited and provided on a first-come, first-served basis.


FUNDING DETAILS

  • Outside Xcel Territory: $1,422,775 available

  • Within Xcel Territory: $3,480,000 available

  • Expected number of awards:

    • Outside Xcel Territory: $250/kWh, up to $7,000 per project

    • Within Xcel Territory: $175/kWh; income-qualified customers receive $370/kWh. Incentives are capped at $5,000 per storage system.


PROJECT GOALS

Reduce battery storage installation costs, expand access to stored solar energy. Incentives are energy resilience, and support greater use of solar-plus storage systems in Minnesota.


WHAT CAN YOU USE IT FOR?

  • Installing a new battery energy storage system paired with new or existing on-site solar

  • Storing solar energy for later use

  • Providing backup power and improving resilience during power outages

  • Reducing electricity use during periods of peak demand

  • Supporting extended energy storage and eligible grid-related uses


IMPORTANT LIMITATIONS AND REQUIREMENTS:

  • Outside Xcel Territory: Minnesota projects outside Xcel territory; new batteries ≤50 kWh, permanently installed, grid-connected, behind-the-meter, and paired with on-site solar. One incentive per property; battery owner must be the payee. Interconnection is required before payment. Tribal set-aside funding available.

  • Within Xcel Territory: New batteries ≤50 kWh, paired with on-site solar; existing systems are ineligible.

  • Not Eligible: Thermal storage, EV batteries, and community solar.


COST SHARE:

  • None


Ready to empower your Tribe’s energy future?

Reach out to grants@colusaindianenergy.com for more information.